Krasta Street in Riga will be limited for movement due to repair of reinforced concrete water pipeline with the length of 2135 meters

0
677

On  Krasta street a major repair of the aqueduct is beginning.  In Riga repair of reinforced concrete water pipeline with the length of 2135 meters will start. The water pipe will be repaired by a trenchless method. It is planned to renew a part of water pipe from the street Ogres to the overpass of Salu tilts (Island bridge) to the street. Lacplesa. It is expected to complete the repair work in September. As the representative of Rīgas ūdens pointed out, renovation of the water supply system was necessary for safety and improvement of water supply. The cost of repairs will amount to 1.2 million euros. During the repair of the water pipe, there are small restrictions on traffic, but big traffic jam has not yet been observed.

LEAVE A REPLY